If you don't have access to heavy equipment or you're just trying to save money, it's possible to grade a residential building by hand. It will take a little longer, but when it's over, you'll have the satisfaction of a job well done!

Steps

  1. 1
    Choose your grade. There are three ways to go here. Either cut straight back into the hillside, and use retaining walls behind the structure to hold the earth back. Or put retaining walls around the lower side of the site, and build up with fill. You will be ordering at least a truckload of dirt here (not that costly, under a $100), and once it's in, it will need a month or so to properly settle. Usually heavy rains will do the trick. The last option is to split the difference - choose a final grade midway between the low and high elevation of the slope. You will need a lot of retaining wall here, both around the low side of the structure, as well as behind it to hold back where you cut out. But with this option you will not be paying for dirt nor waiting for it to settle, and only digging half as much back into the slope.
  2. 2
    Rig up some shade, if there is an existing structure. Grading is hard work and it's easy to get overheated. A tarp of this size will need nailed down or heavy objects laid across the top to keep it from flying off in the wind. Merely tying it down along the edges will cause the grommets to rip out.
    Advertisement
  3. 3
    Remove the sod. The key low-tech tool here is the spading fork. It's like a mini-pitchfork (about $15). Lunge at the root-base of the sod, pry around, and yank.[1] Heap all the sod up into a wheelbarrow, and cart it off to any barren spot on your land. Even if the sod doesn't establish itself (it will need heavy watering in the beginning to do so), it will at least help rebuild the soil.[2]
  4. 4
    Use a laser level and stakes (if there are no existing posts) to pinpoint your exact grade throughout the site. Mark where the final grade will be with masking tape.[3]
  5. 5
    Start cutting out the back. Use a heavy-duty pick/mattock - the heaviest pick you can comfortably swing down with from above your head. Use the mattock end to break up the soil. At the end of your stroke you can pull the dirt towards you and up out of where you're digging. There's a lot of technique to swinging a pick. With the right stroke you can 'pop' quite a large hunk of soil loose. Any rocks you encounter can be used in your foundation. Try swinging the pick from the side and other motions to use different muscle groups.[4]
  6. 6
    Move the loose dirt over to the low side. Shovel the dirt into a wheelbarrow and dump and tamp it using a hand tamper ($20). If you're simply trying to build the grade on the low side, not much tamping is necessary. A good heavy rain will settle your fill. Final tamping will be done after the grade is level and raked out.
  7. 7
    Build the retaining wall if there's fill within the structure to hold back. The retaining wall can double as a stem wall.
  8. 8
    Rake out the grade and tamp. Lay boards across your grade with a 4' to 6' level to get everything smooth and even. The tamping is not that critical if the site will be exposed to the weather for a while. All the hand-tamping in the world will not compare to the settling effect you will get after several rains.
  9. 9
    Here is the final grade, after the driveway was begun:
  10. Advertisement

Things You'll Need

  • Pick/Mattock
  • Spading Fork
  • Shovel (half-length snub-nose)
  • Wheelbarrow
  • Work Gloves
  • Laser Level
  • Hand Tamper
  • 6' Level

Expert Interview

Thanks for reading our article! If you'd like to learn more about levelling a site, check out our in-depth interview with Grant Wallace.

About This Article

Grant Wallace
Co-authored by:
Landscaper
This article was co-authored by Grant Wallace. Grant Wallace is a Landscaper and Owner of Grantlanta Lawn in Atlanta, Georgia. With over seven years of experience, he specializes in lawn maintenance and landscape installation. In 2012, he earned his BA from the University of West Georgia. Grant has been profiled in Shoutout Atlanta, Canvas Rebel, and Voyage ATL. This article has been viewed 80,283 times.
How helpful is this?
Co-authors: 6
Updated: February 6, 2023
Views: 80,283
Categories: Earthworks